In the past 30 years, Eng. Amad, has served as Senior Electrical Power, SCADA, instrumentation, control engineer for Electromechanical Systems (MEP) for a range of projects in the areas of Oil and Gas , Urban Planning (Housing Cities, Industrial Areas, Free Zones, and Resorts), Buildings, Water Supply and Distribution, Wastewater Collection and Treatment Plants, Desalination Plants, Renewable Energy, Environmental and Health, emergency assistance and other various fields. Such were implemented in Palestine or abroad, such as Saudi Arabia and Jordan. His knowledge of the local & international standards coupled with work experience with international firms in design, project supervision and construction management gives him a strong background for managing all aspects of design and design review of electrical engineering systems.
He has proven ability to design a design review of Electrical Infrastructural Systems (High Voltage, Medium Voltage, and Low Voltage Power Systems, Power Stations & Substations, Power Networks, Overhead Lines, Underground Cables, Switchgear, Transformers, Distribution Stations), Telecommunication Infrastructural Systems (Fiber Optic, telephone, television, networks, microwave radio, and satellites). Renewable Energy Systems (Wind Systems, Solar Systems, Systems Power Networks, Systems Automation.
Contractor - EPC (Hired to work on design and build of Lines 1 and 2 of the Riyadh metro networks. These two lines will form part of the six-line metro system that will run for a total length of 176 kilometers across the city and includes 85 stations).
Summary:
The project involved work on Lines 1 and 2 encompasses detailed structural, architectural, electrical, mechanical, BMS, SCADA and transit system design together with construction, procurement of all products and materials, integration, testing and commissioning works and all the necessary support for project delivery Line 1 stretch from north to south through the center of Riyadh, along the Olaya-Batha corridor, covering 38 km. The line will include 22 stations and 4 transfer stations where it will connect with other new metro lines. Much of Line 1 will be under ground. Line 2 runs east to west along King Abdullah Road.
· Initiate, review, approve and maintain, as applicable, design (drawings, specs, materials selection. materials inspections), quality control procedures, inspection testing procedures and plans.
· Supervise the first line inspection and test of constructed assets in accordance with approved Inspection and Test Plans.
· Manage, coordinate and supervise QC Engineers / Inspectors on the project.
· Plan and coordinate with the QC Engineering team on a daily basis to allow for advance planning of the necessary inspections and testing for project activities in their particular section.
· Monitor closely the ongoing work activities under their control and make sure that works are completed in accordance with the approved shop drawings and specification
· Undertake independent inspections and tests to sample the works and the materials being brought to site and BACS store to verify compliance with the obligations of the contract.
· Act as liaison between the Employer, Field Engineering team, Subcontractors QC team and the QC team for the establishing and coordination of inspection activities.
· Manage all quality control staff and activities validating work is completed in accordance with project specifications, to the required quality standards and within prescribed timeframes including the allocation and mobilization of resources and the monitoring of use.
· Attend meetings with Employer, Construction Team, Subcontractors as the Contractor representative on matters relating to quality control.
· Perform inspections and audits of completed records & works and to confirm that they are complete.
Report Non Conformances identified (NCRs and CRs) within their section of the works as per the
Consultant - CM (Hired to work on KAP3, engineering consultancy services of design review and construction supervision of some 3,400 buildings on 600 sites across Saudi Arabia for the implementation of His Highness the King of Saudi Arabia's Security Headquarters Development Project. Value; Works 2.4 billion EUR, services: 180 million EUR, Buildings: 3,400, Sites: 600 and Professionals: 800).
Summary:
The project covered a variety of 48 types of buildings such as police stations, passport buildings, civil defense, hospitals, schools, clinics, residential buildings, stadium, training centers, data centers, facades, etc.
· Initiate, review, approve and maintain, as applicable, design (drawings, specs, materials selection. materials inspections), quality control procedures, inspection testing procedures and plans.
· Create, update and maintain all project submittal platforms and all other project specific quality control documents and reports.
· Manage and delegate tasks to a team of site quality control engineers and inspectors.
· Manage and control quality system requirements for the project, develop and maintain requirements of inspection and testing quality control in order to achieve consistent product quality and standard of workmanship
· Support the review of Electro-mechanical shop drawings and material submittals for conformance with project specifications by assisting the technical department manager with reviewing submitted documents, and by leveraging the knowledge and experience of others in the project team when necessary.
· Provide technical support to Construction Team, identify and communicate product quality requirements / relevant standards to maintain consistency of product quality.
· Create and improve quality awareness within the organization; and identify areas for improvements. Assist in assembling and forwarding project closeout documents that include O&M manuals and as-built.
· Develop a quality & inspection program that meets the provisions of the Operations & Maintenance Activity at project closure phase.
· Advise on the stoppage of work if necessary to resolve matters that affect safety, quality and/or inhibit the logical progress of work.
· Monitor and help construction team in resolve of non- conformance reports.
· Work with Contractor in producing the relevant ITP's.
· Develop the final building system inspection, testing and commissioning plans, forms and documents.,
· Review suppliers and contractors third party testing facilities and conduct periodic inspections and surveillances to assure product quality.
· Perform audits on construction team inspections, documents and records to confirm completeness, correctness, authorized by relevant parties.
· Perform review of developed project plans to assure conformity to the organization quality plan.
· Evaluate and update quality system process and procedures.
· Prepare QA/QC reports and communicate with other project parties.
· Prepared estimated project budget of $8 million USD for the project Developed and oversaw QA/QC program implementation; analyzed and audited quality throughout project; reviewed drawings, materials, documentation and site to ensure international quality standards were met.
· Initiate, review, approve and maintain, as applicable, design (drawings, specs, materials selection. materials inspections), quality control procedures, inspection testing procedures and plans.
· Delivered project two months ahead of schedule despite problems with original design; collaborated with team on developing solutions that kept project on time and maintained required levels of quality.
· Led QA department staff of five; monitored work performance and guided in project completion.
· Orchestrated RFP process; directed team in identifying suppliers and sourcing materials.
· Discussed non-conformance reports with manger and implemented “fixes” according to QA/QC plan.
· Created and implemented testing, start-up, commissioning and training plans.
· Reviewed processes of quality control systems and refined accordingly to increase efficiency of operations and ensure project met milestones.
· Delivered QA/QC reports to senior management.
Contractor – EPC (Hired to work on Well Flow Monitoring SCADA Project for 48 potable water wells located at sites throughout the West Bank and transmission of the flow monitoring data to a Central Control Building including Radio Communication System, Well Sites Mechanical & Electrical Systems (MEP), site stations buildings, Site PLCs & RTUS, SCADA Data Centre Building).
· Prepared estimated project budget of $8 million USD for the project Developed and oversaw QA/QC program implementation; analyzed and audited quality throughout project; reviewed drawings, materials, documentation and site to ensure international quality standards were met.
· Initiate, review, approve and maintain, as applicable, design (drawings, specs, materials selection. materials inspections), quality control procedures, inspection testing procedures and plans.
· Delivered project two months ahead of schedule despite problems with original design; collaborated with team on developing solutions that kept project on time and maintained required levels of quality.
· Led QA department staff of five; monitored work performance and guided in project completion.
· Orchestrated RFP process; directed team in identifying suppliers and sourcing materials.
· Discussed non-conformance reports with manger and implemented “fixes” according to QA/QC plan.
· Created and implemented testing, start-up, commissioning and training plans.
· Reviewed processes of quality control systems and refined accordingly to increase efficiency of operations and ensure project met milestones.
· Delivered QA/QC reports to senior management.
Contractor - Hired to work on projects funded by USAID, Drilling and Pump Testing of Four (4) Water Supply Wells of Depths up to 1000m, Construction of Well #17 Pump Station Building, Facilities (MEP) and Conveyance Systems.
Consultant - CM (Evaluated the existing electromechanical (MEP) and structural conditions of the Palestinian Water Authority (PWA) existing well and pumping stations as program of rehabilitation of PWA Eastern Hebron Bulk Water Supply System and Facility Buildings funded by USAID).
Summary:
Owner Representative - Recruited to manage construction of large factory building and electromechanical Systems (MEP) for iron pipes manufacturing, PE coating and internal cement lining of steel pipes.·
Contractor - (Hired for the Construction of Phase Three West Bank Water Resources Program, Eastern Hebron Bulk Water Supply Project funded by USAID by constructing 2 new well pumping stations buildings, 2 new booster pumping stations buildings, water pipe lines (200Km), 1 power substation building, 33KV power overhead line (30Km), 33KV underground power line (100) km and 1 reservoir).
Cosultant - (Reviewed engineering design and bidding documents for Phase Three of West Bank Water Resources Program, Eastern Hebron Bulk Water Supply Project funded by USAID for Constructing 2 new well pumping stations buildings, 2 new booster pumping stations buildings, water pipe lines, 1 power substation building, 33KV power overhead line (30Km). 33KV underground power line (100) km and 1 reservoir: prepared amendments to align with bid documents),
Contractor - (Hired for the Construction of Phase Three West Bank Water Resources Program, Eastern Hebron Bulk Water Supply Project funded by USAID by constructing 2 new well pumping stations buildings, 2 new booster pumping stations buildings, water pipe lines (200Km), 1 power substation building, 33KV power overhead line (30Km), 33KV underground power line (100) km and 1 reservoir).
Contractor (Led and directed project QC and electrical activities of USAID funded project was designed to provide a reliable source of clean water across the West Bank and Gaza. It included Construction of four pump stations, drilling five deep wells (1000m depth each), installation of high-pressure transmission lines and connecting permanent power for five existing pump stations).
Engineering and Construction Management- The Duties and Responsibilities for Electrical/Instrumentation/Low Voltage Systems included working on the design, site supervision and construction management of :
Contractor - The Duties and Responsibilities for Electrical/Instrumentation/Low Voltage Systems for various projects (included:
• Prepare cost estimates, shop drawings, as built drawings and Quantities take off.
• Lead the construction activities.
• Prepare the contract payment requests and claims.
• Coordination with Utilities.
• Testing and Commissioning.
• Project Hand Over.
Consultant- The Duties and Responsibilities for Electrical/Instrumentation/Low Voltage Systems included:
Projects executed;
Consultant for Building Projects - The Duties and Responsibilities for Electrical/Instrumentation/Low Voltage Systems included:
• Engineering Design,
• Coordination with Utilities and obtaining licenses.
• Construction Management,
• Projects Supervision and Site Support.
Project Planning and Scheduling
undefinedProject Management Professional (PMP)
Microsoft Office
Autocad
Revit
Photoshop
ETAP
Dialux
FactoryTalk OperationSuite
PAC Security Center Software
Total Quality Management (TQM)
Internal Auditor-ISO 9001:2015
OSHA Construction Industry Safety and Health Standards
Internal Auditor-ISO 14001:2015
Project Management Professional (PMP)
Primavera P6
Certified Automation Professional (CAP)
Power Flow and Power Distribution