Iyad Qurae'

Iyad Qurae'

Projects Manager
Hebron

Summary

Resourceful Project Manager with 19 years of expertise in organizing business operations, financial oversight and resource management to achieve smooth flow and project operations. Leads procurement of resources including equipment and supplies. Monitors projects by adhering to production schedule and budget, managing production team, identifying problems and providing targeted solutions. Knowledgeable in accounting principles, bookkeeping, budget, and financial management. Professional Project Management Specialist with experience working with teams to accomplish short- and long-term project goals. Managed budgets and monitored project costs.

Overview

24
24
years of professional experience
5
5
years of post-secondary education
2
2
Languages

Work History

Projects Manager

Gama & United Contracting & Investment Co.
1 2022 - Current

Annual maintenance of water network in Hebron-Palestine

Value: NIS 1,443,127.20.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Consist of the following activates:

  • Construction of 3000 LM of steel pipeline(4 & 6 inch).
  • Construction of 3,000LM of Galvanized steel pipeline (1 & 2 inch).
  • Funded By: Hebron Municipality.

Projects Manager

Gama & United Contracting & Investment Co
07.2023 - Current

Rehabilitation of water network & the sewer network at Al Khalet Al Qubeh Street.

Value: NIS 1,012,148.16

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Consist of the Following Activities:

  • Construction of sewer network (Construction of 1200 LM of uPVC sewer pipes (150mm,200mm), Supply & Install of 60 precast concrete manholes, , Construction of 1,060 LM of steel pipes (100mm 150mm), Reinstatement works (asphalt = 5000m2, base-course= 8300m2)).
  • Funded By: Hebron Municipality.

Projects Manager

Gama & United Contracting & Investment Co.
06.2023 - 12.2023

Construction of three (3) wetlands (15 m3/d of 320 m2) to treat the water coming out from Wadi Al-Arroub Wastewater Treatment Plant.

Value: EURO 369,164.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Consist of the following activates:

  • Construction of three
  • Construction of three (3) solar systems to provide energy for the irrigation pumping systems in three (3) farms (60 kWp).
  • Installation of Six Pumps.

Projects Manager

Gama & United Contracting & Investment Co.
12.2021 - 09.2022

The Extension of the Sewer Network Package 2- Salfeet.

Value: EURO 649,890.

  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Streamlined project processes by implementing Agile methodologies, resulting in increased efficiency and reduced costs.
  • Established effective communication among team members for enhanced collaboration and successful project completion.

Project Consisting of following activities:

  • Construction of DN200mm UPVC SN8 main sewer pipeline & main Manholes
  • Construction Secondary (House connections) DN150mm uPVC sewer pipeline & House connections Manhole.
  • Reinforced Concrete Works (retaining walls,....).

Projects Manager

Gama Construction Co.
10.2021 - 10.2022

Annual Maintenance of the Sewer Network in Hebron.

Value: NIS 2,238,905.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Consist of the Following Activities

  • Construction of 5000 LM of uPVC sewer pipes (110mm, 160mm, 200mm, 250mm, 300mm), Supply & Install of 150 precast concrete manholes, , Reinstatement works (asphalt = 10,000m2,
  • Funded By: Hebron Municipality.

Project Manager

JV. Gama Construction & United Enterprises Co.
12.2019 - 11.2021

Nexus North Water works Project in (T-JWSSC) Service Area-Tubas.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Consist of the following activates:

  • Construction of 40,000LM of PE pipeline (110mm, 90mm, 63mm, 32mm).
  • Construction and finishing of 650m2 storage building for JWSSC.
  • Construction of 500m3 reservoir at Aqqaba.
  • Supplying and installation of 2700 prepaid water meter (house connections).
  • Value: EURO 2,808,000.
  • Funded By: The European Union & AFD

Project Manager

J.V Gama & United Contracting & Investment Co. LTD
02.2018 - 12.2019

Implementation of Sewerage Networks In Qusin And Deir Sharaf

Value: EURO 2,081,526.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Consist of the Following Activities:

  • Managing construction of transmission pipeline UPVC Dia. 315 mm, UPVC Dia. 250 mm, UPVC Dia. 200 mm, Construction of house connections, Construction of main manholes.
  • Construction of Qusin pump station (Q=5L/S Hmax=24m) with its related HDPE 110mm pipeline & Electromechanical works.
  • Construction of Al Ameriyah pump station (Q=5L/S Hmax=50m) with its related HDPE 110mm pipeline & Electromechanical works.
  • Construction of storage building.
  • Funded By: KFD.

Project Manager

Gama Construction Co.
01.2019 - 08.2019

Replacement of Al-Badan Transmission Water pipeline from Al-Badan Well to Al-Masaken Pumping station (PS)-Nablus.

Value: 1,820,000.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Consist of the following activates:

  • (Construction of 1,900LM of DI pipeline (500mm), Construction of 3,475LM of steel pipeline (500mm).
  • Construction of valve chambers and ARV chamber, check valve chamber, butterfly chamber.
  • Funded By: Nablus Municipality.

Projects Manager

Gama & United & investment Co.
1 2018 - 1 2019

Construction of Regional Wastewater Disposal Tulkarem Project.

Value: EURO 9,208,995.

  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Streamlined project processes by implementing Agile methodologies, resulting in increased efficiency and reduced costs.
  • Established effective communication among team members for enhanced collaboration and successful project completion.

Project Consisting of following activities:

  • Managing construction of transmission pipeline (13,607mr UPVC pipeline, 10,133mr Concrete pipeline, 14,613mr Corrugated pipeline and it's manholes house connections, 14,613mr Corrugated pipeline).
  • Construction of two pumping stations
  • Funded By: KFD

Projects Manager

J.V. Gama & United Contracting & Investment Co.
11.2016 - 06.2018

Implementation of Sewerage Networks In Beit Eba, Beit Wazan and Zawata.

Value: EURO 3,449,534.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Consist of the Following Activities:

  • Managing construction of transmission pipeline UPVC Dia. 315 mm, UPVC Dia. 250 mm, UPVC Dia. 200 mm, Construction of house connections, Construction of main manholes.
  • Construction of Qusin pump station (Q=5L/S Hmax=24m) with its related HDPE 110mm pipeline & Electromechanical works.
  • Construction of Al Ameriyah pump station (Q=5L/S Hmax=50m) with its related HDPE 110mm pipeline & Electromechanical works.
  • Construction of storage building.
  • Funded By: KFD.

Project Manager

Gama Construction Co. LTD.
05.2013 - 10.2016

1- Construction of 150 Caravans for Gaza Strip from Oman Charitable Organization.

Value: US $ 2,700,000.

2- Construction & finishing Works At Jericho & AlDahriyia Reform & Rehabilitation Center

Value: US $ 200,000.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.


Project Manager

Gama Construction Co. LTD
04.2012 - 04.2013

Construction of New Main Transmission pipeline for Tubas, Tammoun & Tayaseer – Tubas District &

Value: EURO 1,188,700.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Consist of the Following Activities:

  • Construction of 150mm & 200mm Ductile Pipe line in Tammoun, Tayaseer.
  • Construction of 150mm & 200mm Ductile Pipe line in Tubas.
  • Construction of ARV, WO, GV, PRV, PSV....

Sector Manager

Morganti Group
04.2011 - 03.2012

Construction of Dura Project TO45 at Dura village in Hebron District.

Value: 13,000,000US$.

  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Streamlined project processes by implementing Agile methodologies, resulting in increased efficiency and reduced costs.
  • Established effective communication among team members for enhanced collaboration and successful project completion.

Project Consisting of following activities:

  • Construction of three reservoirs (3000m3 on ground reservoir and two 500m3 elevated reservoirs).
  • Construction of 55,000 LM of Steel Pipeline, manholes .... etc
  • Funded by: AFD.

Construction Manager

AlFahkr Co.
11.2009 - 04.2011

Construction and Installation of Idna internal water network at Hebron District.

Value: 3,800,000US$.

  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Streamlined project processes by implementing Agile methodologies, resulting in increased efficiency and reduced costs.
  • Established effective communication among team members for enhanced collaboration and successful project completion.

Project Consisting of following activities:

  • Construction of (7500 LM steel pipe & 15200 LM Gal. steel pipe).
  • Construction of GV, PRV, WO, ARV Manholes.
  • Asphalting Works (25,000 m²).
  • Funded By:- USAID

Project Manager

Arab Bothers Co.
10.2008 - 10.2009

Aqraba reservoir & Majdal Bani Fadel Reservoirs Project (Funded By PWA).

Aqraba Project Value: 500,000US$.

Majdal Bani Fadel Project Value: 400,000US$.

  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Streamlined project processes by implementing Agile methodologies, resulting in increased efficiency and reduced costs.
  • Established effective communication among team members for enhanced collaboration and successful project completion.

Project Consisting of following activities:

  • Construction of Aqraba & Majdal Bani Fadel Reservoirs.
  • Construction of retaining Walls.
  • Construction of Piping System for both reservoirs.
  • Electrical Works



2- Bureen water project (Funded By USAID).

1.1.

2.1 Construction and Building of Bureen water project (Two Reservoirs)

2.2 Pump station, transmission and network pipes at Nablus District.

Buren Water System Project Value: 3,000,000US$.

Project Engineer

Arab Brothers Co.
11.2008 - 12.2009

Buren Water System project.

Buren Project Value: 3,000,000US$.

  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Streamlined project processes by implementing Agile methodologies, resulting in increased efficiency and reduced costs.
  • Established effective communication among team members for enhanced collaboration and successful project completion.

Project Consisting of following activities:

  • Construction and Building of Buren water project (Two Reservoirs).
  • Pump station, transmission and network pipes at Nablus District.
  • Construction of retaining Walls.
  • Construction of Piping System for both reservoirs.
  • Electrical Works
  • Funded By: USAID.

Field Engineer

CHF International
09.2007 - 10.2008

Construction and Building of PARKs at south, north and middle area Ithna, Thahrieh, Al-Khass, AlRam & Hawwara- Palestine..

Value: 750,000US$.

  • Assisted in developing cost-effective solutions to engineering problems.
  • Managed multiple projects simultaneously, demonstrating strong organizational skills and adaptability under pressure.
  • Promoted positive customer support training experience once project was completed.

Project Consist of the Following Activities

  • Construction of parks.
  • Construction of Buildings.
  • Capacity Building for Municipality & Village Council Staff.

Project Engineer

West Bank Water Department
03.2006 - 08.2007

Construction and Laying of 22KM 600mm Ductile Iron water Pipeline and construction of 5,000m³ Reservoir and asphalting about 40,000m² roads.

Value: EURO 11,500,000

  • Implemented strict safety protocols on job sites that reduced incidents significantly over time.
  • Improved communication among stakeholders through regular updates and meetings.

Project Consist of the following activities.

  • Construction and Laying of 22KM 600mm Restrained Ductile Iron water Pipeline.
  • Construction of 5,000m³ Reservoir.
  • Laying Fiber Optic Cables.
  • Electromechanical Works.
  • Asphalting about 40,000m² roads.
  • Construction of BFV, PRV, ARV, RSV, GV
  • Funded By;- AFD.

Project Manager

Al'Alam Contracting Company
07.2005 - 02.2006

Construction and Finishing of 600m² Hanger and asphalting 3500m² Al-Haraeq road.

Value: 250,000US$.

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Funded By Hebron Municipality.

Supervisor Engineer

Petra Mimar (Planners & Consulting Engineers)
01.2005 - 06.2005

Construction and Finishing of 1850m² School.

Value: $690,000.

  • Provided reporting for forecast analysis and ad-hoc reporting in support of decision-making.
  • Frequently inspected production area to verify proper equipment operation.

Project Consist of the following activities:-

  • Construction of Al Samou'a School.

Project Manager

Abed El-Gaffar Doufish for Contracting
06.2004 - 12.2004

Construction of 4,000m³ Water Reservoir and asphalting main road to reservoir.

Value: $350,000

  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.

Project consist of the following activities:-

  • Construction of 4,000m³ Water Reservoir.
  • Asphalting Works.
  • Laying of pipping system.
  • Electromechanical works.

Project Engineer

Al’itilaf & Tajamou’ Company
02.2004 - 05.2004

Finishing and Rehabilitation of Al-amen Al-watanee Buildings .

Value: $ 200,000.


Field Coordinator

Save The Children' Federation
11.2002 - 12.2003

Infrastructure works in Hebron Governorate.

Value: $1,020,000

Capacity Building, training.

Value: $185,000.

Project consist of the following activities:

  • Solid waste landfill.
  • Construction of Culvert.
  • Construction of schools and retaining walls.
  • Finishing of youth club and outside works.
  • Supplying equipments for staff of Municipalities and Village Councils).
  • Construction of a safe play area.
  • Health and sanitation projects.
  • Renovation and rehabilitation of public health clinics.
  • Construction of sanitation units.
  • Renovation Water Test Laboratories (Equipments).
  • Construction of two internal Waste-water NW - low cost sanitations (Sewer drainage system).
  • Construction of reservoir and laying pipes.
  • Construction of cisterns.
  • Rehabilitation of Yatta Water network and renovation of 1200m3 cistern.

Project Engineer

Al lo'lah Contracting Company
02.2000 - 05.2002

Company’s construction projects

Total Value: $1,500,000).

Follow up projects and prepare financial payments, paper works and shop -as built DWGs for the following projects:-

  • Finishing works of a public building(Dura Municipality) and construction of retaining walls.
  • Health and sanitation projects.
  • Construction of sanitation unit funded by the Ministry of Education.
  • Construction of sewer drainage system funded by SCF.
  • Construction of schools funded by Catholic Relief Services(CRS).
  • Construction of schools funded by (UNDP) through RPC
  • Construction of Health center funded by (PECDAR).

Designer

Rehabilitation Committee
5 1999 - 8 1999
  • Rehabilitation of Al Dweik Palace

Education

Bachelor - Civil Engineer

Palestine Polytechnic University
01.1995 - 04.2000

Skills

Computer skills: Microsoft Word, Excel, Powerpoint, Autocad2007undefined

Personal Information

  • Place of Birth: Hebron, Palestine
  • Date of Birth: 10/15/77
  • Nationality: Palestinian
  • Marital Status: Married

Key Qualifications

  • Significant experience in project management through the involvement in several development programs, especially in developing and upgrading the infrastructure (Schools, Clinics, Youth Clubs, Water Networks, waste water, Solid Waste, Reservoir, ... etc)
  • Wide experience in planning, designing, preparing of tender documents (bids), evaluation of tenders, managing and supervising municipal works and projects
  • Broad knowledge of Palestinian public sector and donor agencies(USAID, Dutch, Difd fund and Bill Gates fund)
  • Good experience in working with private sector, international consultants and local and international NGOs

References

Upon request

Timeline

Projects Manager

Gama & United Contracting & Investment Co
07.2023 - Current

Projects Manager

Gama & United Contracting & Investment Co.
06.2023 - 12.2023

Projects Manager

Gama & United Contracting & Investment Co.
12.2021 - 09.2022

Projects Manager

Gama Construction Co.
10.2021 - 10.2022

Project Manager

JV. Gama Construction & United Enterprises Co.
12.2019 - 11.2021

Project Manager

Gama Construction Co.
01.2019 - 08.2019

Project Manager

J.V Gama & United Contracting & Investment Co. LTD
02.2018 - 12.2019

Projects Manager

J.V. Gama & United Contracting & Investment Co.
11.2016 - 06.2018

Project Manager

Gama Construction Co. LTD.
05.2013 - 10.2016

Project Manager

Gama Construction Co. LTD
04.2012 - 04.2013

Sector Manager

Morganti Group
04.2011 - 03.2012

Construction Manager

AlFahkr Co.
11.2009 - 04.2011

Project Engineer

Arab Brothers Co.
11.2008 - 12.2009

Project Manager

Arab Bothers Co.
10.2008 - 10.2009

Field Engineer

CHF International
09.2007 - 10.2008

Project Engineer

West Bank Water Department
03.2006 - 08.2007

Project Manager

Al'Alam Contracting Company
07.2005 - 02.2006

Supervisor Engineer

Petra Mimar (Planners & Consulting Engineers)
01.2005 - 06.2005

Project Manager

Abed El-Gaffar Doufish for Contracting
06.2004 - 12.2004

Project Engineer

Al’itilaf & Tajamou’ Company
02.2004 - 05.2004

Field Coordinator

Save The Children' Federation
11.2002 - 12.2003

Project Engineer

Al lo'lah Contracting Company
02.2000 - 05.2002

Bachelor - Civil Engineer

Palestine Polytechnic University
01.1995 - 04.2000

Projects Manager

Gama & United Contracting & Investment Co.
1 2022 - Current

Projects Manager

Gama & United & investment Co.
1 2018 - 1 2019

Designer

Rehabilitation Committee
5 1999 - 8 1999
Iyad Qurae'Projects Manager